gentle lemur

At last!

A group working on a new climbing structure on the small orang island. Another working on the gorilla island. 4th January 2022.
This island has given the orangs no opportunity to climb for some time now, so I was very pleased to see that this work has started. There is similar activity on the gorilla island, with a similar plastic pontoon bridge over that moat too. As the zoo will be closing on weekdays for most of this month, I hope these teams will be able to do something similar on the larger orang island too.
 

Media information

Category
Paignton Zoo
Added by
gentle lemur
Date added
View count
551
Comment count
2
Rating
0.00 star(s) 0 ratings

Image metadata

Device
NIKON CORPORATION NIKON D500
Aperture
ƒ/11
Focal length
22.0 mm
Exposure time
1/60 second(s)
ISO
100
Filename
Paignton099B013.jpg
File size
439.9 KB
Date taken
Tue, 04 January 2022 12:18 PM
Dimensions
1414px x 1000px

Share this media

Back
Top