Rajang-GOAT

Capuchin enclosure deconstruction- 14/9/2024

I believe this is where the main entrance to the viewing area was located, at the front of the building.
  • Like
Reactions: Osedax
There are no comments to display.

Media information

Category
Colchester Zoo
Added by
Rajang-GOAT
Date added
View count
116
Comment count
0
Rating
0.00 star(s) 0 ratings

Image metadata

Device
samsung SM-M336B
Aperture
ƒ/1.8
Focal length
4.0 mm
Exposure time
1/282 second(s)
ISO
50
Filename
1000040104.jpg
File size
6.7 MB
Date taken
Sat, 14 September 2024 5:06 PM
Dimensions
4080px x 3060px

Share this media

Back
Top