Arizona Docent

elephant yard construction

November 8, 2011.
As seen from the bike path that runs along 22nd Street in front of the zoo (there is one point where there is a low wall to stand on to look in and no dirt embankment blocking the view). This side of the exhibit will have a circular path with the elephant area forming an inverse circle around the visitors.
November 8, 2011.
As seen from the bike path that runs along 22nd Street in front of the zoo (there is one point where there is a low wall to stand on to look in and no dirt embankment blocking the view). This side of the exhibit will have a circular path with the elephant area forming an inverse circle around the visitors.
 

Media information

Category
Reid Park Zoo
Added by
Arizona Docent
Date added
View count
535
Comment count
1
Rating
0.00 star(s) 0 ratings

Share this media

Back
Top