SMR

Empty Penguin Pool - 14/06/2012

  • Media owner SMR
  • Date added
Construction work under way on the penguin pool. The source of the leak was identified in the shallow half, but when emptied, the lower half also was showing signs of a potential problem so the zoo decided to complete all the modifications necessary in one go rather than having to displace the colonies again at a later date.
Construction work under way on the penguin pool. The source of the leak was identified in the shallow half, but when emptied, the lower half also was showing signs of a potential problem so the zoo decided to complete all the modifications necessary in one go rather than having to displace the colonies again at a later date.
 

Media information

Category
Edinburgh Zoo
Added by
SMR
Date added
View count
722
Comment count
1
Rating
0.00 star(s) 0 ratings

Share this media

Back
Top