Maguari

Europe on the Edge/Tiger Enclosure Demolition at Chester, 30/09/17

  • Media owner Maguari
  • Date added
In preparation for the new lemur and fossa enclosures.
 

Media information

Category
Chester Zoo
Added by
Maguari
Date added
View count
740
Comment count
1
Rating
0.00 star(s) 0 ratings

Image metadata

Device
NIKON CORPORATION NIKON D7000
Aperture
ƒ/11
Focal length
18.0 mm
Exposure time
1/500 second(s)
ISO
2500
Flash
Off, did not fire
Filename
DSC_4319.JPG
File size
8.1 MB
Date taken
Sat, 30 September 2017 12:19 PM
Dimensions
4928px x 3264px

Share this media

Back
Top