KevinB

New entrance construction site - New wadi/bioswale with overflow into pelican pond, 2025-10-29

  • Media owner KevinB
  • Date added
At least I think this will become a wadi/bioswale rainwater collection and infiltration area that will eventually will get grass and/or other plants covering the soil.
  • Like
Reactions: Père Damian's Deer
There are no comments to display.

Media information

Category
Planckendael
Added by
KevinB
Date added
View count
57
Comment count
0
Rating
0.00 star(s) 0 ratings

Image metadata

Device
OLYMPUS CORPORATION E-M10MarkIV
Aperture
ƒ/4.5
Focal length
14.0 mm
Exposure time
1/80 second(s)
ISO
200
Flash
Off, did not fire
Filename
PA290697.JPG
File size
8.8 MB
Date taken
Wed, 29 October 2025 9:50 AM
Dimensions
5184px x 3888px

Share this media

Back
Top