Went today. It was bitterly cold but, as always, a pleasure.
Since I went late last year, several more areas have been fenced off where works are being carried out :-
1) The old buildings on the far side of the courtyard are due to be demolished, replaced with I don't know what yet.
2) A new cafe/eating area is being built where the alpacas were - opposite the newer toilet blocks close to the Forest Adventure Playground.
3) A whole new set of bird/small animal enclosures have sprung up.
4) The leopard enclosure looks excellent from a distance and the raised observation area looks complete ( we spied one of the leopards stalking around the caged area outside the perimeter )
5) The giraffe house is well under way, although the animals themselves are not yet on site.
6) The buildings housing the Play Barn, Coffee Bar and Safari Store are set to be knocked together and turned into a two storey building, which will house the new Entrance and meeting rooms.
There are excavators everywhere.
Just as a matter of interest,if you are planning a visit, the S American Viva is currently open 1-3, which will change post-March 10 once Winter opening has expired.