wyldjaguar
Well-Known Member
My scanner is still not cooperating with my new PC, so I printed what I discovered, took a photo and attempted to post as an attachment (click to enlarge). Apologies for the delay.
Here are the current proposed plans for the new Cleveland Metroparks Zoo lion exhibit renovation:

For those familiar with the zoo, this expansion/renovation basically envelops the current outdoor flamingo pool and indoor holding area, as well as the small, adjacent waterfowl exhibit. It would also cut into the seating area for the zoo's main food court and eliminate the stone walls (which once surrounded the old sea lion exhibit prior to it's conversion into the food court). CLR Design also did the architecture for the recently-opened African Elephant Crossing, so I have to believe the exterior viewing-platform arbors would match that of it's sister exhibit across the entry plaza. As long as this project does not take five-years to materialize, while not the first "next project" I would've selected after the Elephant Crossing, it shows progress and has my blessing...
Here are the current proposed plans for the new Cleveland Metroparks Zoo lion exhibit renovation:

For those familiar with the zoo, this expansion/renovation basically envelops the current outdoor flamingo pool and indoor holding area, as well as the small, adjacent waterfowl exhibit. It would also cut into the seating area for the zoo's main food court and eliminate the stone walls (which once surrounded the old sea lion exhibit prior to it's conversion into the food court). CLR Design also did the architecture for the recently-opened African Elephant Crossing, so I have to believe the exterior viewing-platform arbors would match that of it's sister exhibit across the entry plaza. As long as this project does not take five-years to materialize, while not the first "next project" I would've selected after the Elephant Crossing, it shows progress and has my blessing...