On January 24th, 2021 a cooperation agreement was signed between Linyi Polar Ocean World and Xi’an Zhongxin Biotechnology Co., Ltd. for the future "transformation, upgrade, operation and management of Linyi Polar Ocean World".
扬帆起航,临沂极地海洋世界再出发_百科TA说
Prior to this arrangement the facility had received a great deal of negative reviews and complaints from park guests since its opening in 2018, ranging from limited animal viewing and entertainment options to insufficient temperature control in the building. Originally opening with belugas and bottlenose dolphins, as of early 2020 the park seems to no longer house any cetaceans, leaving their exhibits empty and performances in the park limited to a brief sea lion show (image, source).
Xi'an Zhongxin Biological Technology Co., Ltd. will provide all-round support and construction for Linyi Polar Ocean World in terms of capital, technology, operation management, and venue equipment upgrades. At the same time, the Linyi Polar Ocean World Phase II Killer Whale Stadium project will be launched.
扬帆起航,临沂极地海洋世界再出发_百科TA说
Prior to this arrangement the facility had received a great deal of negative reviews and complaints from park guests since its opening in 2018, ranging from limited animal viewing and entertainment options to insufficient temperature control in the building. Originally opening with belugas and bottlenose dolphins, as of early 2020 the park seems to no longer house any cetaceans, leaving their exhibits empty and performances in the park limited to a brief sea lion show (image, source).
