The cable car is going to have been closed to quite a while by the time that it finally reopens. I expected that the plans would have been fairly advanced by the time that they closed in 2023, which may have been the case and then changes needed to be made to the route and the design, I don't know.
Yeah, according to the article it’s taken an expanded route and will require the removal of 13 trees (no great loss in the whole scheme of things). Aside from the previous infrastructure being at the end of its working life, it’s didn’t meet the requirements of people with disabilities.