Here is a link to the SketchUp file for those wishing to use it.
Dropbox - Papua House.skp
Final rules and requirements.
1. Deadline - final project must be turned in by midnight on December 8th - one month from today.
2. Final design will be required to have diagrams and layouts (you may use the attached SketchUp file).
3. The zoo requests to have both male and female restrooms available within the building.
4. Sufficient life support systems must be included.
We will use the same grading system as the last challenge:
0-20 - Theme (0 is no theme at all; 20 is a fully thought out, functional, appropriate, and exciting theme)
0-20 - Animal collection - The majority of animals the zoo requires should be included. Additional animals may be included, but those that do not fit the scheme will loose points.
0-20 - Keeper and housing requirements (0 no keeper/housing; 20 keeper areas and housing requirements are fully met, functional, and accessible)
0-20 - Exhibits (0 exhibits do not appear on design; 20 exhibits are well designed for the animal needs and for visitor viewing)
0-20 - Visitor experience (0 visitors not able to see animals or meet basic needs; 20 visitor walks away from exhibit feeling a sense of "wow")
0-20 - Zoo's requested requirements/needs (0 - none of the zoo's requirements are met; 20 - all requirements are met and well designed into the exhibit)
0-20 - Write-up (0 no write-up present; 20 write-up well written, includes all needed information, presented clearly and succinctly)
0-20 Landscape design (0 no landscape information given; 20 - detailed information on existing plants and what will be planted in exhibits and in landscape/garden areas)
0-20 Interpretation/conservation (0 no interpretation or conservation message; 20 visitor leaves knowing more about Papua-New Guinea, the animals there, why they should care about them, and what they can do).